News
Summer Building Works: Disruption to IT Services and Library
Both IT Services and the Library are undetaking significant building projects this summer.
-
IT Services: Relocation of Computer Labs and service points from the third floor of the Haslegrave building down to the ground floor.
-
S006 Lab located in Chemical Engineering will be closed for refurbishment from Monday 21st of June with anticipated opening date to be during July.
-
Pilkington Library: Replacement of lighting in the Library, extension of the wireless network and redecoration of group study rooms.
There is likely to be considerable disruption in both buildings at times, including noise disturbance and restricted access to facilities. We apologise for any inconvenience this may cause.
Regularly updated information www.lboro.ac.uk/library/about/summerworks.html throughout the summer on the progress of both building work projects is available.
In addition the S006 Lab in Chemical Engineering is now closed until mid July for new improved lighting, new carpets, and redocoration.
Regards,
IT Services
